endeavourweigh

PLC/ IOT Work

To promote the new concept and information enable system following are his expectations

Modification Projects incorporated:

  • Wear out of brake shoe for Hoisting motions,
  • Wear out of long travel wheels (Skew and Drifts),
  • Temperature of Gear Boxes / Motors etc.

Operational Information:

  • No of operations, no of start / hour
  • No of backtracking operation
  • Pulsating operation.
  • Operational Hours, Load spectrum, SWP info.
  • Alarm history and duration (Overloading, Overspeed etc)
  • Hoist / Crane duty as per Design